Our Projects
.png)

Name: Design and construction of the installation for dust and gas cleaning of the rotary kiln No. 3 of the lime burning shop
Location: Temirtau, Karaganda region, Republic of Kazakhstan
Status: The object was commissioned.
Put into operation: in 2013
Total gas consumption: 142,000 m3 / h
The concentration of dust at the entrance to the system: 6 800 mg / Nm3
The concentration of dust at the outlet of the system: 45 mg / nm3
The applied design solutions allowed to achieve the highest indicators of the efficiency of the gas cleaning system: 99.5%.
Engineering Plus completed the project "turnkey". The company's specialists developed design and design documentation, carried out the delivery of equipment, completed the entire range of construction and installation work, carried out commissioning and industrial commissioning.
Name: Design of the complex of the blast furnace №7 "Rossiyanka"
Location: Lipetsk, Lipetsk region, Russia
Status: The object was commissioned.
Commissioned: October 28, 2011.
The volume of the blast furnace: 4300 m3
Design capacity: more than 3.4 million tons of pig iron per year
Power utilization CHP: 150 MW
Total investment: 43.6 billion rubles
In the project of the blast furnace No 7 “Rossiyanka”, the most advanced technologies for environmental protection were used - highly efficient aspiration systems, a closed water circulation cycle, maximum processing of blast furnace gas into electricity for industrial needs at the CHP plant built in conjunction with the blast furnace.
Specialists of Engineering Plus developed a feasibility study (project) for the reconstruction of the blast furnace of NLMK with the construction of blast furnace No. 7 and carried out a detailed design of the main process unit, the casting yard and the gas cleaning system; performed supervision.